United States. War Production Board
91 works on record
Works

Wartime production achievements and the reconversion outlook
Orders and regulations
Priorities in force
Production requirements plan form PD-25A
Time cycle for procurement
Controlled materials plan
A brief presentation of the controlled materials plan
Summary of war supply and facility contracts by county, cumulative through Sept. 1943
Production charts, war production drive
Wheel tractor production, actual and scheduled, July 1, 1943-July 29, 1944
Tractor production, actual and scheduled, July 1, 1943-July 1, 1944
Analysis of copper savings through substitution of silver
Time lag for procurement of selected items
Analysis of use of WPB forms
The production picture
Average basic metal content per $10,000 of shipments of PD-25A product groups
Your place in the war effort
War production and reconversion
Functional directory
1,600 labor-management committees in the war production drive
United States exports of raw cotton and cotton manufactures and imports of cotton cloths and cotton yarns, 1942-1943
Controlled materials plan, supply - demand
Staff report by Aluminum Requirements and Distribution Section, Aluminum and Magnesium Division, covering requirements, third quarter 1943
Summary of WPB-732 data for 1,779 large metal products manufacturing plants, July 1942-April 1944
Industrialists report on their labor-management committees
A handbook on wage incentive plans
Controlled materials plan expanded Class B product list
Approved list of "B" products for which claiman agencies will report requirements to industry divisions
Ways of dealing with absenteeism as part of the war production drive
Handbook of helpful services for joint labor-management committees, war production drive
Catalog of office supplies and forms for the use of all requisitioning offices of the War Production Board in Washington, D.C.
First report on progress of reconversion in 42 selected industries
Alphabetical listing of major war supply contracts, cumulative through February 1943
Handbook for all WPB employees
Acceptance schedules, airframe production program (Nov. 1, 1942, through Dec. 31, 1944
War manufacturing facilities authorized through August, 1944, listed alphabetically by company and plant location
Second survey of consumer requirements .
Tonnage and percentage distribution of general imports by priority classification, shipping areas and countries, November, 1942
Mailing list for Form WPB-732, Plant report of operations
Reference manual for packaging and packing of subsistence items for overseas shipment, war procurement agencies, United States Government
Summary report on the production and performance of German synthetic tires and other transportation items
Paper and paperboard production compared with total inventories of fibrous raw materials
Controlled materials plan operating manual
War manufacturing facilities authorized through Oct. 1944, by general type of product of operator in 1939
War Production Board allocation classifications and purchasers' symbols for purchase orders and WPB reports (authorized by General priorities regulation no. 10)
WPB Industry Divisions statements of requirements for allocated tires for original equipment by product group and claimant agency
Steel budget plan
Analysis of maintenance, repairs and operating supplies requirements of the pulp, paper, printing and publishing industries
National emergency specifications for the design, fabrication and erection of structural steel for buildings
First report on construction for reconversion
Internal combustion engine shipments
War supply manufacturers as of April 1, 1942
Manual of policy and procedures
Alloy steel survey
Critical components data book
Scheduling primer
Take care of your automobile
Report of Steel Division on steel expansion for war
Highlights of labor management committee reports in the ... region
Official plan book, war production drive
War production drive informational materials
Navy war production program
Materials handbook
Review: war construction and facilities
State distribution of war supply and facility contracts, June 1940 through January 1942
Handbook of definitions of materials and end products used in "M" and "L" orders issued by the War production board through March 1, 1943
Principles of design & standardization of forms printed and otherwise produced
Hide and leather policies of the War Production Board and presecessor agencies
Annual report of the Chairman of the War Production Board for the year 1944
Part 1075: Construction
Commercial steel castings
Interpretations of the war housing construction standards
Materials review
War production drive
Official plan book
The geographic distribution of manufacturing facilities expansion, July 1940-May 1944
Time factors in reconversion
The world production of munitions at the end of the war in Europe
Commodity directory
Revised handy guide and outline of procedure for manufacturers under the Controlled materials plan
World munitions production, 1938-1944
National scrap harvest
Summary of war supply and facility contracts by county, cumulative through June 1943
Annual report, Bureau of Stockpiling and Transportation, calendar year 1944
American industry in war and transition, 1940-1950
Final report, modern designs for prefabricated & demountable buildings
Reconverting released army capacity
Oil burners, 1929-1948 [i.e. 1945]
Resumption of production of domestic electric flat irons (April 1943 to August 31, 1944)
Accuracy of material supply estimates
World production of combat armaments