Vincent A. Mabert
14 works on record
Works

Production planning, scheduling, and inventory control

Integrated production systems

Integrated Production Systems Design, Planning, Control, and Scheduling
Cases in manufacturing and service systems management
The detail scheduling of a part-time work force
The Box-Jenkins forecasting technique
Sampling as a solution methodology
Statistical versus sales force-executive opinion short range forecasts
Cases in operations management
Heuristic work force scheduling with variable shift lengths and labor productivity differences
Forecast modification based upon residual analysis
An introduction to short term forecasting using the Box-Jenkins methodology
Managing productivity in the United States Postal Service
Evaluating scheduling decision rules using a fractional factorial design